This project is the total strip-out of the existing fit-out and design of the new fit-out design compliant to the operational requirements. CDS Architects were responsible for the entire design including architectural, MEP services, structural, fire, security, audio-visual, acoustics, accessibility and quantity survey. CDS engaged, managed, and coordinated the design of the various consultants required for this work.
Replacement of existing mechanical services as part of the 30-year upgrade plan. This upgrade work includes the replacement of the air-conditioning plant, replacement of the existing ceiling ductwork and replacement of existing ceiling.
Copyright © 2018 Carvalho Design Solutions - All Rights Reserved.
Powered by GoDaddy